RCRA
Consultants for pre RCRA investigation of a major smelting and secondary refining company. This included underground tank testing and the subsequent removal of two underground tanks and the abandonment in place of a third tank. The work required numerous soil borings and the installation of a monitoring well
Completed an RCRA which required extensive soil sampling and removal for a compactor manufacturer in Hackensack, NJ.
Pre RCRA and Environmental Audits for a machine shop located in Hackensack, NJ., a surgical instrument manufacturer located in Irvington, NJ. and a paper box manufacturer in Matawan, NJ.
Complete RCRA filings, preparation of sample plans and cleanup programs for 2 large machine shops located in Newark and Irvington, NJ., a precious and base metal electroplating facility in Little Falls, NJ., and two embroidery facilities located in Guttenberg, NJ.